Feeds:
Posts
Comments

Archive for November 11th, 2008

Road Crossing

Road Crossing
1.1. Cover
In this design of pipeline at road crossings we have adopted a depth of cover of 1.2 meters minimum from the top of the pipe to the travelled surface of the road, in accordance with API RP 1102.
1.2. Load
1.2.1. General
The pipeline at road crossing will be subjected to both internal loads from pressurization [...]

Read Full Post »