Road Crossing
1.1. Cover
In this design of pipeline at road crossings we have adopted a depth of cover of 1.2 meters minimum from the top of the pipe to the travelled surface of the road, in accordance with API RP 1102.
1.2. Load
1.2.1. General
The pipeline at road crossing will be subjected to both internal loads from pressurization [...]
Archive for November 11th, 2008
Road Crossing
Posted in Pipeline Engineering on November 11, 2008 | Leave a Comment »
